📖 View Step-by-Step Bead Positioning Guide (Optional)▼
On a soroban, the number 9999999 is built with these column positions: the millions column shows 9 with the upper bead active and 4 lower beads pushed up; the hundred-thousands column marks 9 with the top bead touching the beam and 4 lower beads raised; the ten-thousands column reads 9 because the upper bead is engaged and 4 lower beads are slid up; the thousands column represents 9 by combining the five-bead with 4 lower beads moved upward; the hundreds column shows 9 with the upper bead active and 4 lower beads pushed up; the tens column marks 9 with the top bead touching the beam and 4 lower beads raised; the ones column reads 9 because the upper bead is engaged and 4 lower beads are slid up.
- Step 1. Set the soroban to zero before you begin, keeping the upper beads separated from the beam and the lower beads at rest.
- Step 2. Adjust the millions column to 9. the millions column shows 9 with the upper bead active and 4 lower beads pushed up.
- Step 3. Configure the hundred-thousands rod for 9. That means the hundred-thousands column marks 9 with the top bead touching the beam and 4 lower beads raised.
- Step 4. On the ten-thousands column, show 9. In practice, the ten-thousands column reads 9 because the upper bead is engaged and 4 lower beads are slid up.
- Step 5. Set the thousands column for 9. Here, the thousands column represents 9 by combining the five-bead with 4 lower beads moved upward.
- Step 6. Adjust the hundreds column to 9. the hundreds column shows 9 with the upper bead active and 4 lower beads pushed up.
- Step 7. Configure the tens rod for 9. That means the tens column marks 9 with the top bead touching the beam and 4 lower beads raised.
- Step 8. On the ones column, show 9. In practice, the ones column reads 9 because the upper bead is engaged and 4 lower beads are slid up.
- Step 9. Finish by scanning the rods from the highest place to the units column and confirm the result is 9999999.